Info Error Some information is missing or invalid below.

Women's Curved Hem Top Tank Tops Side Split Sleeveless Round Neck Asymmetrical Tee

Women's Curved Hem Top Tank Tops Side Split Sleeveless Round Neck Asymmetrical Tee
Women's Curved Hem Top Tank Tops Side Split Sleeveless Round Neck Asymmetrical Tee
Women's Curved Hem Top Tank Tops Side Split Sleeveless Round Neck Asymmetrical Tee
Women's Curved Hem Top Tank Tops Side Split Sleeveless Round Neck Asymmetrical Tee
  • $31.99

  • This product is not eligible for coupons. However, you are able to earn and redeem Kohl's Cash® and Kohl's Rewards® on this product.

Color: White


  • +

quantity-warning-icon close-icon
kohls_img404

This top is made of 95% polyester and 5% spandex, lightweight, stretchy, breathable, and shape-retaining for all-day comfort. It has a round neck, sleeveless cut, side splits, and asymmetrical curved hem for a modern silhouette. It pairs with jeans, leggings, or high-waisted shorts, layered under jackets for casual-chic looks. Suitable for daily wear, gym, and travel, it follows standard gentle washing instructions.


PRODUCT FEATURES

  • Material: This top is crafted from 95% polyester and 5% spandex, lightweight, stretchy, breathable for all-day comfort with great shape retention.
  • Design: Boasts a round neck, sleeveless cut, side slits, and asymmetric curved hem for a modern flattering silhouette with subtle edge.
  • Match: Pairs with jeans, leggings, or high-waisted shorts; layer under jackets or wear solo for casual-chic or relaxed daily style.
  • Occasion: Great for everyday wear, casual outings, gym sessions, and summer travel, offering versatile comfort and fashion-forward design.
  • Care Instruction: Machine wash cold on gentle cycle, tumble dry low or hang dry. No bleaching. Low iron if necessary; avoid high heat to maintain fabric.
  • 95% Polyester,5% Spandex
  • Hand Wash
  • Imported
Seller Information; Report Suspicious Activity

TimberTech Gardens Inc
1500 Wynkoop St Denver, CO 80202
manage@timbertechgardens.com

To report suspicious marketplace activity, please reach out to Kohl's Customer Service at 855-564-5705 or use the "Ask Us" button on Kohl's Customer Service page to chat with an associate 24 hours a day, 7 days a week.

    For complete details, see our Shipping and Returns policies.

    TimberTech Gardens Inc
    1500 Wynkoop St Denver, CO 80202
    manage@timbertechgardens.com

    To report suspicious marketplace activity, please reach out to Kohl’s Customer Service at 855-564-5705 or use the "Ask Us" button on Kohl’s Customer Service page to chat with an associate 24 hours a day, 7 days a week.


    Kohl's Certified Partner

    review loader
    Next Product Next Product